
Gel battery "Bike Power" in order to provide enough power for the start and all other consumer circuits. Developed for the requirements! All batteries have to be charged before the first use.
The energy taken from a battery must be replenished immediately. Batteries begin to sulfate (destruct themselves) at 12.4 volts. If you drive little, please check the battery every 6 weeks and be sure to recharge it from 12.5 volts - otherwise there is a risk of loss of performance and a significantly reduced service life! Connect seasonal vehicles to a suitable trickle charger!
Replacement rubber for foot shift lever
This...
Our screw kit includes 2 Torx screws with the size M8x30....
Fuel level sensor for
BMW R1200GS (2004-2009)...